1 General
2 Basic requirements for the operation of high voltage equipment
2.1 General safety requirements
2.2 Inspection of high voltage equipment
2.3 Switching operation
2.4 Working on high voltage equipment
3 Organizational measures to ensure safety
3.1 Organizational measures to ensure safety on electrical equipment
3.2 Work ticket system
3.3 Work permit system
3.4 Work guardianship system
3.5 Work interruption, transfer and termination system
4 Technical measures to ensure safety
4.1 Technical measures for working on electrical equipment to ensure safety
4.2 Power outage
4.3 Power inspection
4.4 Grounding
4.5 Hanging signboards and installing fences (fences)
5 Safety measures for substations and power plants during line operations
6 live working
6.1 General requirements
6.2 General safety technical measures
6.3 Equipotential operation
6.4 Live disconnection and lead wire
6.5 live shorting device
6.6 charged water rinse
6.7 Live cleaning machinery
6.8 Inductive voltage protection
6.9 Overhead insulated arm car operation
6.10 Protection gap
6.11 Live detection insulator
6.12 Low voltage live working
6.13 Storage, use and testing of live working tools
7 Inspection and maintenance of generators, synchronous cameras and high voltage motors
8 Work on sulphur hexafluoride electrical equipment
9 Work on low-voltage power distribution units and low-voltage lines in power outages
Work on 10 secondary systems
11 Electrical test
11.1 High pressure test
11.2 Measurement work using portable instruments
11.3 Measurement work with clamp ammeter
11.4 Measuring the insulation work with a shaker
12 power cable work
12.1 Basic requirements for the operation of power cables
12.2 Safety measures during operation of power cables
13 General safety measures
Appendix A Substation (Power Plant) Switch Operation Ticket Format
Appendix B Substation (Power Plant) First Work Ticket Format
Appendix C Power Cable First Work Ticket Format
Appendix D Substation (Power Plant) Second Work Ticket Format
Appendix E Power Cable Second Work Ticket Format
Appendix F Substation (Power Plant) Live Work Work Ticket Format
Appendix G Substation (Power Plant) Accident Emergency Repair Form
Appendix H Secondary Work Safety Measures Ticket Format
Appendix I Nameplate Pattern
Appendix J Insulating safety tools test items, cycles and requirements
Appendix K Electrical Test Standard for Overhead Insulated Bucket Vehicles
Appendix L Test Equipment, Cycles and Requirements for Ascending Work Tools
Appendix M Emergency Ambulance Act
The authenticity of this information has not been confirmed by the international electrical network, for your reference only.
2 Basic requirements for the operation of high voltage equipment
2.1 General safety requirements
2.2 Inspection of high voltage equipment
2.3 Switching operation
2.4 Working on high voltage equipment
3 Organizational measures to ensure safety
3.1 Organizational measures to ensure safety on electrical equipment
3.2 Work ticket system
3.3 Work permit system
3.4 Work guardianship system
3.5 Work interruption, transfer and termination system
4 Technical measures to ensure safety
4.1 Technical measures for working on electrical equipment to ensure safety
4.2 Power outage
4.3 Power inspection
4.4 Grounding
4.5 Hanging signboards and installing fences (fences)
5 Safety measures for substations and power plants during line operations
6 live working
6.1 General requirements
6.2 General safety technical measures
6.3 Equipotential operation
6.4 Live disconnection and lead wire
6.5 live shorting device
6.6 charged water rinse
6.7 Live cleaning machinery
6.8 Inductive voltage protection
6.9 Overhead insulated arm car operation
6.10 Protection gap
6.11 Live detection insulator
6.12 Low voltage live working
6.13 Storage, use and testing of live working tools
7 Inspection and maintenance of generators, synchronous cameras and high voltage motors
8 Work on sulphur hexafluoride electrical equipment
9 Work on low-voltage power distribution units and low-voltage lines in power outages
Work on 10 secondary systems
11 Electrical test
11.1 High pressure test
11.2 Measurement work using portable instruments
11.3 Measurement work with clamp ammeter
11.4 Measuring the insulation work with a shaker
12 power cable work
12.1 Basic requirements for the operation of power cables
12.2 Safety measures during operation of power cables
13 General safety measures
Appendix A Substation (Power Plant) Switch Operation Ticket Format
Appendix B Substation (Power Plant) First Work Ticket Format
Appendix C Power Cable First Work Ticket Format
Appendix D Substation (Power Plant) Second Work Ticket Format
Appendix E Power Cable Second Work Ticket Format
Appendix F Substation (Power Plant) Live Work Work Ticket Format
Appendix G Substation (Power Plant) Accident Emergency Repair Form
Appendix H Secondary Work Safety Measures Ticket Format
Appendix I Nameplate Pattern
Appendix J Insulating safety tools test items, cycles and requirements
Appendix K Electrical Test Standard for Overhead Insulated Bucket Vehicles
Appendix L Test Equipment, Cycles and Requirements for Ascending Work Tools
Appendix M Emergency Ambulance Act
The authenticity of this information has not been confirmed by the international electrical network, for your reference only.